S.No Title Start Date End Date Download
1 Providing, Fixing, Repair & Calibration of OCEMS & Repair/Replacement of CCTVs Including Wiring, DVR, Antennas and all other works contingent thereto at 95 MLD Sewage Treatment Plant South Zone & North Zone at Amritsar. 25/11/2024 09/12/2024 Download
2 Aug of Water Supply System by Drilling of T/Wells no 1,2,3 along canal incl Const. of Pumping machinery with pressure gauge & bulk flow meter at each tube well, chlorinator Electrical works at Bhikhiwind, Distt Tarn Taran Punjab under AMRUT 2.0 (Package -1) 29/11/2024 13/12/2024 Download
3 Aug of Water Supply System by Drilling of T/Wells no 4,5,6 & 7 along canal incl Const. of Pumping machinery with pressure gauge & bulk flow meter at each tube well, chlorinator Electrical works at Bhikhiwind, Distt Tarn Taran Punjab under AMRUT 2.0 (Package -2) 29/11/2024 13/12/2024 Download
4 Prov lay, joining, cutting, testing and commissioning of the work of DI K9 Rising main and other related works at Bhikhiwind, Distt Tarn Taran, Punjab AMRUT 2.0 Sch Part 4 (Package 3) 29/11/2024 30/12/2024 Download
5 ਅਮਰੂਤ 2.0 ਸਕੀਮ, ਭਾਗ 1, ਫੇਜ਼ – 9 ਤਹਿਤ ਡਿਸਟ੍ਰੀਬਿਊਸ਼ਨ ਨੈੱਟਵਰਕ ਲਈ ਸ਼ਾਹਕੋਟ ਜਿਲਾ ਜਲੰਧਰ ਵਿਖੇ ਖਪਤਕਾਰਾਂ ਨੂੰ ਟੁੱਟੀਆਂ ਦੇ ਕੂਨੈਕਸ਼ਨ ਮੁਹੱਈਆ ਕਰਵਾਉਣੇ, ਵਾਟਰ ਸਪਲਾਈ ਸਿਸਟਮ ਦਾ ਵਿਕਾਸ ਤੇ ਵਿਸਤਾਰ, ਟਿਊਬਵੈਲ ਦੀ ਇੰਸਟਾਲੇਸ਼ਨ ਅਤੇ 0.5 ਲੱਖ ਗੈਲਨ OHSR ਦਾ ਨਿਰਮਾਣ। 05/12/2024 16/12/2024 Download
6 ਅਮਰੂਤ 2.0 ਸਕੀਮ, ਭਾਗ 1, ਫੇਜ਼ – 9 ਤਹਿਤ ਲੋਹੀਆਂ ਖਾਸ, ਜਿਲਾ ਜਲੰਧਰ ਵਿਖੇ ਖਪਤਕਾਰਾਂ ਨੂੰ ਟੁੱਟੀਆਂ ਦੇ ਕੂਨੈਕਸ਼ਨ ਮੁਹੱਈਆ ਕਰਵਾਉਣੇ, ਵਾਟਰ ਸਪਲਾਈ ਸਿਸਟਮ ਦਾ ਵਿਕਾਸ ਤੇ ਵਿਸਤਾਰ। 05/12/2024 16/12/2024 Download
7 Aug of W/S system by drilling of tube wells along canal incl const. of pump chamber, Pumping Machinery with pressure gauge & bulk flow meter at each tubewell chlorinator, electrical works and prov lay joining cutting testing & commissioning of the work DI K-9 rising at Rahon Town, Distt SBS Nagar (AMRUT 2.0) 25/11/2024 17/12/2024 Download
8 Providing Tap Connections to consumers, Extension and Augmentation of Water Supply System at Kothaguru District Bathinda for Distribution Network, Installation of Tube well and Construction of 1.0 Lakh Gallon OHSR under AMRUT 2.0 Scheme 25/11/2024 20/12/2024 Download
9 Augmentation of Water Supply System by Drilling of tube well no.1, 2 & 3 along canal including construction of pump chamber, pumping machinery with pressure gauge & bulk flow meter at each tube well, chlorinator, electrical works and other related works at KothaGuru Ka. 25/11/2024 13/12/2024 Download
10 Providing, laying, jointing, cutting, testing and commissioning of the work of DI K-9 Rising Main and other related works at KothaGuru Ka 25/11/2024 20/12/2024 Download
11 Providing Tap Connections to consumers, Extension and Augmentation of Water Supply System at Amloh District Fatehgarh Sahib for Distribution Network. Installation of Tube well and Construction of 0.5 Lakh Gallon OHSR under AMRUT 2.0 Scheme, Part-1, Phase-1 22/11/2024 17/12/2024 Download
12 Prov and Laying of GI K7 R/Main from existing GMADA Pipeling upto proposed UGSR at Jhungian Road and Distribution System at Kharar, Under AMRUT 2.0 22/11/2024 30/12/2024 Download
13 Work Tender under Various Schemes except SBM 2.0 & AMRUT 2.0 Download
14 Status of Water Supply Distribution Tender under AMRUT 2.0 Download